Aluminium Formwork for High Rise Buildings

Now a day’s Aluminium formworks used to construction for High Rise Buildings. Probably the most versatile modern construction system, aluminium formwork system, which has created new benchmarks in construction.  This produces a lightweight panel with an excellent stiffness to weight ratio, yielding minimal deflections under concrete loading. Once erected, these panels are subjected to a trial erection in order to eliminate any dimensional or on-site problems.


 Aluminium formwork  High Rise Buildings video 


Aluminium formwork can be used reused  more times  with careful handling and good maintenance. One of the biggest advantage of aluminium formworks has its unsur- passed construction speed. Compared to conventional construction procedures, use of aluminium formworks reduces floor completion cycle from 15 days to 4 to 5 days, primarily because of light weight nature enables fast erection and dismantling and simple system of pin & wedge makes the assembly easier. Pouring concrete together for walls, beams and floors and System ensures accuracy of dimensions without need for re-work and uncomplicated system  requiring use of minimum skilled labour.

But, over and above its strong advantages of speed, economy, re-usages and no extra cost, Aluminium Formworks give your construction structure a very high quality finish. High quality finish is possible due to uniformity of panels and precise joints, as it leaves no deflection, creating evenness, eventually adding style and stability.

1 comment:

  1. To see projects constructed with aluminum concrete formwork visit https://picasaweb.google.com/concreteforming

    ReplyDelete